Mold Removal Cost In Boston, MA
A typical professional mold job in Boston runs about $1,600 to $6,500 before rebuild. Boston sits in Suffolk County.
1947Median year homes were built
74%Homes built before 1980
65%Homes rented, not owned
$710,400Median home value
307,840Housing units
663,972People
Half the homes in Boston were built before 1947, and 74 percent went up before 1980. Older plumbing, roofs and window seals are where slow leaks start, and slow leaks are the mold most home policies leave out. Most homes in Boston are rented, 65 percent. A renter's policy covers belongings and liability, while the owner's policy covers the building.
Typical Prices In Boston
| Job | Size | National Range | Boston Estimate |
|---|---|---|---|
| Mold Remediation | a typical professional job | $1,500 to $6,000 | $1,600 to $6,500 |
| Mold Remediation | an attic | $2,000 to $7,500 | $2,150 to $8,100 |
| Mold Inspection and Testing | a visual inspection | $200 to $600 | $200 to $650 |
| Mold Inspection and Testing | an inspection with samples | $300 to $1,000 | $300 to $1,100 |
| Mold Inspection and Testing | a clearance test | $300 to $800 | $300 to $850 |
The standard limited fungi endorsement caps mold at $5,000. Against a typical job here of up to $6,500, that cap falls short by about $1,500 at the top of that range. Read the form
Water Hazards FEMA Rates Here
FEMA rates Suffolk County high for inland flooding, coastal flooding, hurricane, cold wave. Water from these events is where mold claims start, and flood water is a separate policy. FloodSmart says mold damage is not covered under standard NFIP flood policies. FloodSmart
| Hazard | FEMA Risk Rating |
|---|---|
| Inland flooding | Relatively High |
| Coastal flooding | Relatively High |
| Hurricane | Relatively High |
| Cold wave | Relatively High |
| Winter weather | Relatively Low |
ZIP Code Neighborhoods In Boston
| ZIP | Median Year Built | Homes Rented | Median Home Value |
|---|---|---|---|
| 02108 | 1938 | 46% | $1,570,400 |
| 02109 | 1955 | 67% | $1,007,200 |
| 02110 | 1977 | 34% | $1,104,700 |
| 02111 | 1986 | 73% | $953,400 |
| 02113 | 1938 | 85% | $693,900 |
| 02114 | 1965 | 77% | $927,900 |
| 02115 | 1938 | 85% | $1,015,400 |
| 02116 | 1938 | 65% | $1,583,500 |
| 02118 | 1950 | 68% | $1,029,100 |
| 02119 | 1962 | 76% | $668,900 |
| 02120 | 1974 | 88% | $941,200 |
| 02121 | 1950 | 77% | $548,100 |
| 02122 | 1938 | 56% | $656,400 |
| 02124 | 1938 | 58% | $607,200 |
| 02125 | 1938 | 65% | $645,400 |
| 02126 | 1952 | 58% | $515,000 |
| 02127 | 1947 | 55% | $858,600 |
| 02128 | 1938 | 71% | $680,000 |
| 02129 | 1938 | 50% | $926,000 |
| 02130 | 1938 | 54% | $763,700 |
| 02131 | 1938 | 43% | $634,200 |
| 02132 | 1948 | 29% | $714,000 |
| 02133 | Not published | 0% | Not published |
| 02134 | 1947 | 87% | $586,700 |
| 02135 | 1956 | 78% | $684,000 |
| 02136 | 1955 | 47% | $566,300 |
| 02163 | 1984 | 100% | Not published |
| 02199 | 1970 | 97% | Not published |
| 02210 | 2012 | 77% | $1,212,000 |
| 02215 | 1952 | 92% | $683,800 |